“La Valbona” 300kW Biogas Plant

Project information

Development and construction of a 300 kWe biogas plant

The plant consists of a primary fermenter and a secondary fermenter that allow the process to have an optimal hydraulic retention time.

Livestock waste is loaded through a pre-tank, from which it is pumped to the primary fermenter, while the plant biomass is handled through a loading hopper and a Biomix pump.

Watch VIDEO of the full realization

Input matrices

  • Cattle slurry

Technical description

1 Loading Pre-tank
d. 8m h. 4m
1 Primary Fermenter
d. 22m h. 6m
1 Secondary Fermenter
d. 22m h. 6m
1 Biomix pump
Plant power
300 kWe