Project information
Development and construction of a 100 kWe biogas plant
The biogas plant built by our team for the Motris Company represents the final piece in the process of a civil sewage treatment plant.
The biological sludge from the newly constructed plant is pumped into a single-stage fermenter. The biogas produced is sent to a cogenerator installed in a room that will produce electricity for the purification plant’s own consumption. Such a plant, having as its feedstock a material quite different from slurry, biomass or other product, uses different, specially designed components.
This plant is a demonstration of Synergy’s ability to develop different systems using waste types of various origins.
Input matrices
- Biological sludge
Technical description
1 Pre-tank
loading
1 Fermenter
16m in diameter and 6m high
Plant power
100 kWe